Step 1: Prepare Subfloor for Tiles
NOTE: This cork floor was installed on underlayment-grade plywood and man-made board substrates.Subfloor must be clean and level. Fill any low spots with the appropriate filler and sand any high spots.
Step 2: Apply Subfloor Primer (Supplied With Cork Floor)
Subfloor primer must be used regardless of type of subfloor. Pour subfloor primer into clean paint tray. Using a roller, apply thin and even coat of primer and cover subfloor completely. Under normal temperature and humidity conditions primer will dry in 30 to 45 minutes. Primer must be totally dry before application of adhesive.Step 3: Apply Adhesive
Pour some adhesive into clean paint roller tray. Using a clean roller, apply a thin coat of adhesive over approximately 50 square feet at a time. A uniform, glossy film indicates a sufficient amount of adhesive. Stay off adhesive while it is drying (approximately 20-30 minutes). Once adhesive is dry, that section of installation must be completed within one hour. Never lay tiles into wet adhesive.Step 4: Lay Tile
Use any standard laying pattern (Image 1). Mix cork parquets from various cartons to maintain natural color and pattern variation. Allow ¼” expansion space between finished floor and all walls. Cut tiles to size with utility knife for edges (Image 2).TIP: Store cork flooring out of the box at job site for minimum of 72 hours. During storage and installation, maintain temperature and relative humidity to level consistent to the conditions that will prevail when building is occupied.
没有评论:
发表评论