STEP 1: PREPARE THE BASE
For patio and walkway applications: Roto-till portland cement into existing soil (94 lbs per 30 sq. ft.)
For driveway applications: Use 4-6" finely crushed stone on compacted soil
For driveway applications: Use 4-6" finely crushed stone on compacted soil
STEP 2: INSTALL EDGE RESTRAINT
Establish perimeters of project
Install pavestone edging using 12" spikes
Install pavestone edging using 12" spikes
STEP 3: SCREED SAND
Shovel pavestone sand or sharp, coarse, granular sand between two pieces of 1" (outside dimension) conduit pipes
Use 2x4 to screed and level sand
Use 2x4 to screed and level sand
STEP 4: LAYING STONE
Create custom patters by combining various shapes and colors of stone
Start in a square corner and work out in a triangular direction
Lay each stone next to previously placed stone and slide it straight down
Start in a square corner and work out in a triangular direction
Lay each stone next to previously placed stone and slide it straight down
STEP 5: COMPACTION
Compact pavestones firmly into previously leveled sand
Fill joints by sweeping pavestone sand into gaps
Compact the surface one more pass to complete lockup
Fill joints by sweeping pavestone sand into gaps
Compact the surface one more pass to complete lockup